loading

فلزکاری PRANCE تولید کننده پیشرو در سیستم های سقف و نما فلزی است.

محصولا
محصولا

How to ensure mesh panel flatness during suspended ceiling installation?

Achieving a flawlessly flat suspended mesh ceiling requires precise leveling and a stable support grid. Begin by installing primary suspension hangers—adjustable wire cords or rigid rods—at calculated intervals based on panel dimensions and weight. Use laser or optical leveling instruments to mark a continuous reference plane around the room perimeter. Secondary framing members (T-profiles or C-channels) should clip into primary hangers and be aligned to the reference plane, ensuring uniform elevation across the grid. Panels then lock onto the grid with spring-clip fasteners that allow slight vertical adjustment to fine-tune flatness. For spans exceeding 1 m, introduce diagonal cross-bracing behind the mesh to resist deformation and torsion. Before final locking, inspect each panel with a straightedge or laser line to detect any high or low spots; adjust hanger heights individually to correct misalignments. Finally, tighten all fasteners in a sequence from the center outward to prevent introducing stress. By combining precise leveling, adjustable suspension, and cross-bracing, aluminum mesh suspended ceilings can maintain perfect flatness over time.


How to ensure mesh panel flatness during suspended ceiling installation? 1

پیش
How to improve ventilation using aluminum mesh panels in facade systems?
How does perforation size impact the sound absorption of mesh panels?
بعد
توصيه ميشه
اطلاعاتی وجود ندارد
علاقه مند؟
از یک متخصص درخواست تماس بگیرید
راه حل های مناسب برای سقف فلزی شما & پروژه های دیوار یک راه حل کامل برای سقف فلزی سفارشی دریافت کنید & پروژه های دیوار پشتیبانی فنی سقف فلزی را دریافت کنید & طراحی دیوار، نصب & تصحیح
آیا به محصولات ما علاقمند هستید؟
ما می توانیم نقشه های نصب را به طور خاص برای این محصول برای شما سفارشی کنیم. لطفا با ما تماس بگیرید.
弹窗效果
Customer service
detect