loading

PRANCE metalwork, metal tavan ve cephe sistemlerinin lider üreticisidir.

Ürünler
Ürünler

What installation practices ensure ceiling fire rating integrity?

Maintaining a ceiling’s fire rating hinges on replicating the tested assembly exactly. First, installers must follow the specified panel layout and joint staggering patterns to prevent continuous thermal bridges. Insulation layers (mineral wool, gypsum boards) must be cut and fitted tightly without gaps, and intumescent coatings applied at manufacturer-recommended thickness. Perimeter gaps require fire-stop sealants or perimeter trims to match test conditions. Suspension systems must use certified fusible links or fire rods, installed at designated spacing; using standard clips can invalidate the rating. Whenever penetrations occur—for lighting, speakers, or ducts—approved fire-rated collars or sleeves must be fitted immediately, matching the tested detail. Finally, post-installation inspections should verify sealant bead continuity and link activation settings. Deviation from any tested component or detail risks compromising the entire fire rating.


What installation practices ensure ceiling fire rating integrity? 1

prev
Alüminyum asma tavanın yangına dayanıklı olmasını sağlayan malzemeler nelerdir?
What ceiling thickness is required for effective fire resistance?
Sonraki
Sizin için önerilir
veri yok
Ilgilenen?
Bir uzmandan çağrı isteyin
Metal tavanınız için özel olarak tasarlanmış profesyonel çözümler & duvar projeleri. Özelleştirilmiş metal tavan için eksiksiz bir çözüm edinin & duvar projeleri. Metal tavan için teknik destek alın & duvar tasarımı, montaj & düzeltme.
Ürünlerimizle ilgilenir misiniz?
Kurulum çizimlerini sizin için bu ürüne özel olarak özelleştirebiliriz. Lütfen bizimle iletişime geçin.
弹窗效果
Customer service
detect