1 . Measure the elevation of the S plank ceiling after installation according to the requirements of the design drawings , measure the horizontal line of theceiling and fix the corner at the horizontal line around the wall
2 . Measure the construction direction To make hoisting holes on the ceiling of the building structure at a distance of < 1200mm , and fix the thread rodwith expansion screw
3 . Fix the carrier on the thread rod by direct hanging method and adjust the level . The carrier must be multilateral
4 . Install the S plank ceiling : buckle the S plank ceiling into the clamping position of the carrier in the same direction
5 . The size of the edge should be measured according to the site conditions , and the ceiling should be placed on the L angle6 . Keep your hands clean during the installation process , and there should be no sweat , oil , etc