3500m2 steel frame + aluminum facade project completed with high quality within 30 days!

Measuring the facade details, building a 3D model, disassembling the steel frame, welding up the steel frame, extracting the measurement for aluminum panel, producing the panel, setting up the steel frame, puting the panel on the steel frame.

Foshan PRANCE Building Material Co.,Ltd

Web:www.prancebuilding.com

E-mail:[email protected]