PRANCE metalwork is a leading manufacturer of metal ceiling and facade systems.
1) Surface with galvanized protect the channel from being rust 2) Flexible suspension system makes each ceiling tile easily installed and disconnected 3) Profile size adjustable, can be made in your requiring size 4) long time service life. 5) With high tensil stress and blening stress 6) Well adapted in the market |
Item |
Sectional view |
Height |
Width |
|
V channel |
30/38 |
|||
main channel |
38 |
10/12/14 |
||
cross channel |
50 |
15/17/19 |
||
Furring channel |
||||
L Angle |
22-35 |
|||
Wire Clip |
22-35 |
Item |
Width |
Height |
||
stud50 |
50 |
48 |
||
stud63 |
63 |
31 |
||
stud75 |
75 |
48 |
||
stud100 |
100 |
48 |
||
stud150 |
150 |
48 |
Item |
Width |
Height |
||
track50 |
50 |
40 |
||
track63 |
63 |
25 |
||
track75 |
75 |
40 |
||
track100 |
100 |
40 |
||
track150 |
150 |
40 |
IMAGE | ACCESSORIES |
GI DRYWALL SYSTEM | |
1.Fiber glass 2.Metal Stud 3.Gypsum board 4.Metal stud 5.Metal track 6.Board bead 7.Conner bead |
METAL STUD: 1PCS/M2 METAL TRACK:0.334PCS/M2 CONEER BEAD:0.2PCS/M2 BOARD BEAD:0.2PCS/M2 |
GI PROFILE CEILING SYSTEM | |
1.Hanger 2.Main grid 3.Wire clip 4.Main grid hanger 5.Furring channel 6.Wall angle 7.Gypsum board |
Main grid:0.334PCS/M2 WALL ANGLE:0.2PCS/M2 FURRING CHANNEL:1PCS/M2 HANGER:2SET/M2 WIRE CLIP:8PCS/M2 |