loading

PRANCE metalwork is a leading manufacturer of metal ceiling and facade systems.

Products
Products

How To Install Curtain Wall System?

Installing a complete curtain wall system begins with pre-installation surveys to confirm anchor embed locations and floor elevations. For stick-built systems, begin by setting and leveling vertical mullions, anchoring them to each slab edge. Install transoms between mullions at designated heights, ensuring consistent module dimensions. Apply sealant and back-bedding to frame interiors. Lift glass or spandrel panels into the frames, seating them on setting blocks and securing them with pressure plates or gaskets. For unitized systems, crane-lift factory-assembled modules into position, align them, and fasten anchor brackets. After all modules are in place, seal joint interfaces with silicone sealant. Complete final inspections on alignment, seal integrity, and drainage to ensure the system meets performance specifications.


How To Install Curtain Wall System? 1

prev
How To Install Curtain Wall?
How To Install Curtain Wall Glass?
next
recommended for you
no data
Interested?
Request a call from a specialist
Tailor-make profect solutions for your metal ceiling & wall projects. Get a complete solution for customized metal ceiling & wall projects. Receive technical support for metal ceiling & wall design,installation & correction.
Contact Info
Tel: +86-757-83138155
Tel/Whatapps: +86-13809708787
Fax: +86-757-83139722
Office: 3F.1st Building,No.11 Gangkou Rd, Chancheng, Foshan, Guangdong.

Factory: 169, South Area, Base of Electrical and Electronic lndustry, Baini, Sanshui, Foshan, Guangdong.
Are you interested in Our Products?
We can customize installation drawings specifically for this product for you. Please contact us.
弹窗效果
Customer service
detect