What procurement considerations impact lead time for a custom structural glazing facade solution?

2025-12-11
Lead time depends on design approval cycles, engineering modeling, glass manufacturing, special coatings, IGU production, aluminum fabrication, shipping logistics, on-site storage capacity, and installation crew scheduling. Custom shapes or oversized panels require extended glass-furnace time. International logistics and customs clearance may add delays. A typical custom façade may require 16–30 weeks from design finalization to site delivery. Early coordination with all stakeholders minimizes risk.
prev
How does a structural glazing facade manage building movement caused by thermal expansion and wind loads?
How can digital design tools improve engineering accuracy for a large-scale structural glazing facade project?
next
Related questions
no data
GET IN TOUCH WITH Us
Contact Info
Tel: +86-757-83138155
Tel/Whatapps: +86-13809708787
Fax: +86-757-83139722
Office: 3F.1st Building,No.11 Gangkou Rd, Chancheng, Foshan, Guangdong.

Factory: 169, South Area, Base of Electrical and Electronic lndustry, Baini, Sanshui, Foshan, Guangdong.
Are you interested in Our Products?
We can customize installation drawings specifically for this product for you. Please contact us.
弹窗效果
Customer service
detect