PRANCE metalwork is a leading manufacturer of metal ceiling and facade systems.
Professional installation integrates pre-fabrication control, methodical site procedures and compliance verification. Pre-start activities include verified shop drawings, a site-specific method statement, and a full-size mockup subject to owner witness tests for air, water and structural performance. Use certified facade installers trained by the metal curtain wall fabricator and require lifting trials and qualified rigging with exclusion zones to ensure safety in dense urban sites (Dubai, Abu Dhabi, Almaty). Maintain torque logs for all anchors, record batch numbers for sealants and spacers, and perform non-destructive checks on critical fastenings. Installation must follow recognized standards (ASTM/EN system tests) and local code requirements; on-site acceptance tests should be scheduled after a defined number of installed bays. Protect assembly work from adverse weather—sandstorms in the Gulf and heavy snow or freezing in Central Asia—using temporary enclosures or weather windows for sealant cure. Ensure coordination with structural and MEP trades to avoid interface clashes and secure movement joint continuity. A project QA file with certificates, test reports and photographic records enables regulatory approvals and supports warranty claims. For metal curtain wall suppliers, providing trained supervision and validated installation checklists is critical for achieving compliant, safe and high-quality installation outcomes.