Implementation timelines vary by project complexity, customization, and supply chain conditions. For predictable enterprise deployments, break the program into design, fabrication, delivery, and installation phases with clear milestones.
Design & approvals (2–8 weeks): supply BIM objects, shop drawings, and mockups early to shorten review loops. Custom finishes or perforations may add approvals.
Procurement & fabrication (4–12 weeks): standard modules with approved finishes typically ship faster; bespoke items and large orders may require extended lead times. Factor in finish curing and QC inspections.
Logistics & staging (1–4 weeks): plan JIT deliveries to align with site readiness—avoid long on-site storage. For multi-site rollouts, schedule phased fabrication to match each site’s install window.
Installation (dependent on site): trained installers can often complete ceiling modules faster than traditional systems due to modularity. For large atria or integrated curtain wall interfaces, allow additional time for coordination.
Risk buffers: include contingency time for finish rework, additional mockups, and unexpected site conditions. For enterprise programs, use a master schedule and centralized procurement to manage lead time variability.