loading

PRANCE metalwork is a leading manufacturer of metal ceiling and facade systems.

Products
Products

What quality control and testing procedures are recommended before installing glass exterior walls?

2025-12-18
Rigorous QC includes factory production inspections, shop drawing verification, material certification review, and mockups. Mockups should replicate typical panel assembly, interfaces, and anchorage, and be tested for water penetration (ASTM E1105/CWCT), air infiltration (ASTM E283), structural performance (ASTM E330), and thermal performance where appropriate. Insulated glass units should be sampled and tested per ASTM E2190 or EN 1279 for gas fill, seal durability, and dew point. Laminated units require verification of interlayer bonding and optical quality. On-site dimensional surveys prior to fabrication reduce fitment issues. During installation, third-party façade inspectors should witness anchorage torqueing, sealant application, and drainage installation; thermography and on-site air/water tests during completion verify performance. Documentation—traceability of glass lots, tempering certificates, and manufacturer test reports—supports long-term warranties. Post-installation, commissioning tests and snagging rounds ensure compliance with design performance before handover.
prev
How do glass exterior walls perform under fire safety regulations and emergency evacuation requirements?
How do glass exterior walls integrate with curtain wall systems and aluminum framing solutions?
next
Related questions
no data
GET IN TOUCH WITH Us
Contact Info
Tel: +86-757-83138155
Tel/Whatapps: +86-13809708787
Fax: +86-757-83139722
Office: 3F.1st Building,No.11 Gangkou Rd, Chancheng, Foshan, Guangdong.

Factory: 169, South Area, Base of Electrical and Electronic lndustry, Baini, Sanshui, Foshan, Guangdong.
Are you interested in Our Products?
We can customize installation drawings specifically for this product for you. Please contact us.
弹窗效果
Customer service
detect