PRANCE metalwork is a leading manufacturer of metal ceiling and facade systems.
The Gaoneng Development Tower, located on Gangkou Road in Chancheng District, Foshan City, is a landmark building that not
only embodies the appreciation and stability of state-owned assets but also plays an active role in promoting social stability and
economic development.
PRANCE company has had the privilege of undertaking the curtain wall, doors, and windows production and installation for the
construction of the tower. Today, the project has been successfully completed, and our team, with its professional expertise and
exquisite craftsmanship, has delivered this important architectural achievement. It has added a splendid touch to the urban
construction and economic development of Foshan City.
Project Overview and Architectural Profile:
The Gaoneng Development Tower project, with a construction area of 24,205.05 square meters, has attracted numerous high-end modern service industry enterprises. PRANCE commenced the production and installation of the curtain wall, doors, and windows for the tower in March 2023. Remarkably, the project was successfully delivered within a construction period of just seven months.
Project timeline/Project address:
March 2023 to October 2023 / Foshan, China
Exterior/Interior/Hanging System Products We Offer:
Application Scope:
The exterior curtain wall of the tower.
Services We Offer:
Planned product drawings, demonstration of 3D models, multiple cross-references of product information, selection of materials for the product, processing and production, as well as providing technical guidance and
support during construction.
| Challenge
This curtain wall project faced multiple challenges in design, construction and material processing. The design of the facade was unique in material and style, requiring each piece of material to be irregular and non-repeating, and on-site measurements revealed varying heights of the scaffolding, which made it a major challenge to accurately measure and complete the material processing, as any error could cause delays to the entire project.
| Solution
To meet these challenges, the PRANCE project team took a number of steps. First, the designers meticulously measured and numbered every inch of material during the measurement. So that workers can install them one by one according to the number. Secondly, in the actual construction, if there are materials that cannot be changed on site, the on-site management will immediately contact the designer to check the size and number, and dock with the factory processing to ensure timely delivery. The perfect cooperation of our team makes the project completed smoothly.
| Renderings of the project are available for display
| On-Site Installation Process
| Final Completion