PRANCE metalwork is a leading manufacturer of metal ceiling and facade systems.
residential building facade is delivered by PRANCE METALWORK BUILDING MATERIAL CO.,LTD with unprecedented turnaround times, competitive price levels, and superior quality. Manufactured from well-selected materials with modern technology, this product is highly recommended. It is designed following the concept of striving for first-rate. And the quality testing tends to be more rigorous and controlled based on the international standards instead of the national rules.
To establish PRANCE brand and maintain its consistency, we first focused on satisfying customers' targeted needs through significant research and development. In recent years, for example, we have modified our product mix and enlarged our marketing channels in response to the needs of customers. We make efforts to enhance our image when going global.
Many customers show great concern about the delivery time. To meet customer's marketing needs, we promise the on-time delivery of residential building facade and other products at PRANCE.
A typical project that showcases PRANCE's capabilities involves the renovation of an old building, encompassing the design, production, and installation of a new facade with 4000m2 within 45 month.
Located on Hulin Road in Wenchong Street, Huangpu District, Guangzhou, the property initially had low efficiency. However, after the construction, it has been transformed into Baidu Apollo Park, which is now recognized as China's most comprehensive and visually appealing intelligent connected vehicle application park. Notably, the park features the establishment of Baidu's national next-generation AI open innovation platform for autonomous driving.
Baidu is a prominent Chinese technology company that provides a diverse range of Internet-based services and products. It is widely recognized as the leading search engine in China, akin to Google's prominence worldwide. Baidu offers an extensive array of services encompassing search engines, online advertising, maps, cloud storage, artificial intelligence, autonomous driving, and more.
This project involves the renovation of an existing building by refurbishing it on the foundation of its original architectural structure and installing beautiful exterior wall cladding.
Following video shows the whole process from old building to completely renovation building with beautiful facade.
Project Duration: November 4th, 2020 to January 28th, 2021
Project Area: 4000 square meters
Total Aluminum Panel Usage: 4000 square meters
Total Steel Usage: 100 tons
Number Of Construction Personnel: 60 people
Construction Equipment: 40 welding machines, 10 aerial work platforms, 2 cranes, 4 cutting machines, and N units of other auxiliary tools.
First Difficulty: Given short completion time: Complete 4000m2 metal facade cladding project within 45 month.
Our work included:
Due to the short time frame, simultaneous operations across multiple processes are required.
Each material needs to have its dimensions and quantities extracted from the model separately, and production and welding should be arranged directly.
A seamless flow from the framework to the aluminum panels is essential, and any errors should be avoided to ensure completion within the given timeframe.
There are high demands for on-site personnel coordination, precision in framework fabrication, and speed in factory processing.
Cross-Operations with Multiple Teams on Site: Due to this project being a renovation of an existing building rather than a completely new construction, combined with the short time frame, all teams are required to work at the same time.
These teams include landscaping, aluminum cladding installation, demolition, transportation, piping, and other teams beside us. There is a high demand for site and time allocation, as we are working around the entire exterior facade of the building. Every corner of the site needs to be utilized efficiently.
Due to the tight timeline and the fact that the client has awarded us the project for both material supply and installation, our technical team and project management team have decided to adopt a modified construction sequence.
Typically, the standard procedure involves constructing the framework first, followed by on-site measurements, ordering and manufacturing the aluminum panels, and finally installing the panels. However, in order to expedite the project, we have made the decision to simultaneously proceed with framework welding, wall installation, and the parallel process of ordering and fabricating aluminum panels based on the model dimensions. Subsequently, the aluminum panels will be installed synchronously, prioritizing progress while ensuring that the steel framework is in place.
Base on the requirement, PRANCE offer the Product Feature shown below:
Production is a crucial aspect where we have always excelled, as we align with and meet the schedule set by the on-site project team. Ensuring the accuracy of the framework dimensions, on-site measurements, and aluminum panel dimensions, all intricately interconnected, requires meticulous coordination. Effective division of labor is not a simple task to accomplish.
This project has been contracted to the PRANCE team as a complete package, including the supply of materials and installation. This includes the provision of embedded components and iron square passageways. Due to the tight timeline, we need to deliver the project to the client within two months. Therefore, we are combining several processes together for this project. We will weld and assemble the iron square passageways and simultaneously arrange workers to install the embedded components on the upper floors. Next, we will lift the fully formed iron framework onto the building and securely fix it in place. Once the framework is in position, we will take on-site measurements to ensure consistency with our existing model dimensions before ordering and installing the facade wall cladding.
Installing the steel frame onto the building
Installing the facade wall cladding onto the steel frame
PVC panel contains characteristics of good chemical stability, corrosion resistance, high strength, not aging, fireproof and high insulation. The surface is relatively smooth, non-absorbent, easy processing and so on.
PVC panel is a high thermal-forming material, commonly used to replace stainless steel products, and other corrosion-resistant synthetic materials. As a result, PVC panel is a widely used in many areas.
Advantages of PVC panel:
1: Long usage life: unlike metal that could be rusted, PVC is difficult to break down and difficult to be corroded.
2: Waterproof: PVC panel is not absorbent, so it can be installed in moisture place like bathroom.
3: Rich color choices: According to clients’ wishes, almost all colors and patterns can be produced.
4: Easy to install: PVC panel is light weight, smooth, so the installation process is relatively simple.
Thickness |
Width |
Length |
Weighl |
Material |
0.5cm |
18.5cm |
2m |
1.55kg-3.5kg |
30% |
0.55cm |
20cm |
2.7m |
40% |
|
0.6cm |
25cm |
3m |
45% |
|
0.7cm |
30cm |
4m |
50% |
|
0.75cm |
59.5cm |
5.8m |
60% |
|
0.8cm |
60cm |
5.95m |
70% |
|
0.9cm |
60.3cm |
or by customer require |
80% |
Base materials | Polyvinylchlorid(PVC) | |
Surface treatment | Printing/Transfer/Lamination | |
Type of surface | flat/Middle groove/flat with side groove/v-groove/3-waves/4-waves/4-round-wave/steps/2-grooves |
PRANCE one-stop solution for building material to the customers |
||||||
Project Name: Dock En Seine Offices | ||||||
Location: France | ||||||
Area: 16200.0sqm | ||||||
Solution: Ceiling / Lighting Windows and Doors Air condition system |
||||||
Project Year: 2010 |
Office Ceiling With 600x1200x0.8 aluminum ceilingoffice will be more bright and smart |
Meeting room Ceiling 12mm gypsum board after paint meeting room will be tidy and comfortable More Case |
Restaurant Ceiling Mineral fiber board is good for noise reduction |
PRANCE offers building interior square tube ceiling false ceiling in many big projects. They combine functions and aesthetics, and can be customized.
PRANCE aluminum ceiling features:
1. Adapt to various environments, moisture, wind, corrosion and so on.
2. Aluminum ceiling is light in weight, high in hardness, durable and long in use.
3. Construction installation is easy to disassemble, easy to repair and easy to clean.
4. Long-lasting color and resistance to deformation, product environmental protection can be recycled, it is a green environmentally friendly material.
5. Aluminum ceilings are rich in style and color and can be customized.Suitable for all occasions.
Welcome to send an email to us for more details , we are keen to wait for your consultation.
Width(mm) | Length(mm) | Thickness(mm) |
30 | 1000-5000 | 0.7-1.2 |
40 | 1000-5000 | 0.7-1.2 |
50 | 1000-5000 | 0.7-1.2 |
Quare tube ceiling Material: AA Grade Aluminum Alloy Surface treatment: Electrostatic Powder Coating Specification: 20-50mm Standard thickness: 0.8mm-1.2mm |
Square tube carrier Material: Steel Surface treatment: Galvanized or Polyester Black Height: 30-40mm Length: 3000mm Standard thickness: 0.7mm |
1 | Thread rod | 4 | Square tube ceiling |
2 | Hanger for M | 5 | Hanger for spring tee |
3 | Main chanel | 6 | Spring tee |
PRANCE one-stop solution for building material to the customers |
||||||
Project Name: Yinzhou City office | ||||||
Location: Zhejiang, Ningbo, China | ||||||
Area: 13500.0 sqm | ||||||
Solution: Ceiling / Lighting Windows and Doors Air condition system |
||||||
Project Year: 2015 |
Office Ceiling Fashion & durable when using Prance yellowish-brown square tube in office |
Public area Ceiling Prance black round tube will be resistance soiling & modern in public area |
Boardroom Ceiling Fireproof, moisture-resistant, tidy andcomfortable when using Prance gypsum board |
Prance sound insulated artistic Office Building lobby glass roof is very popular in commercial complex projects in many contries. It combines functions and aesthetics, and can be produced customized.
Product Specification — Glass Roof Steel Profile | |
1. Surface Work | PVDF Coating |
2. Surface Color | White, Black, Customized |
3. Steel frame Profile | Round Tube, Square Tube, or other customized
shape base on project situation |
4. Glass Choice | Laminated glass (8+1.52PVB+8; 10+1.9PVB+10 etc). Hollow Tempered Glass (6+9A+6; 8+12A+8 etc). |
5. Hardware | KIN LONG, HEHE, Roto-frank |
ProjectName:NASCAR Honor HallLocation: America
Area: 7000 sqm Year: 2010 |
Products:Glass Curtain WallALuminum Curtain Wall
Lighting Ceiling Glass Fence |
|
Exposed Glass Curtain Wall | ||
Curtain Wall of Aluminum Panel | ||
Stone Curtain Wall |
High-quality wood-grain square channel system with a 15-year warranty, transforming your home's aesthetics into a part of nature, revitalizing its natural beauty.
Product: Baffle Profile System, U-Baffle Ceiling System
Application: Building facade, wall cladding, Interior ceiling
Quantity: 3,000 ㎡
The challenge for our product lies in the strict control of its quality because this project involves high-end residential buildings where the decorative materials used need to be exceptional. Therefore, we have selected wood grain from an Italian brand, coupled with Akzo's primer, which provides a 15-year outdoor warranty. We will tailor our approach according to the project requirements and the client's needs.
PRANCE provides decorative aluminum square tubes for both interior and exterior applications. The surface treatment involves the use of Italian wood grain paper Idek+ in combination with Dutch AkzoNobel powder coating. This combination offers a unique appearance, texture, and tactile sensation, along with exceptional weather resistance, color retention, acid resistance, and oil resistance. The warranty for these products is 15 years. Material import reports and testing reports are available for the surface treatment.
We adhere to a rigorous process during the manufacturing of our products. This process includes meticulous selection and inspection of raw materials, precise production and processing, with a maximum allowable dimensional error of 0.02mm. We strictly control the entire forming process.
In the next step, we focus on surface treatment to ensure the quality of spray coating, smooth surfaces, color consistency, and achieve a realistic wood-like effect.
Furthermore, we maintain strict control over the packaging and classification of our products to ensure their safety and suitability. This way, customers can efficiently install the products upon receiving them.
Profile Baffle
Size: 50*100*1.5mm, 50*200*2.0mm
Color Code: PO12 code 17-013/16, PO28 code 17-013/17 U-Baffle Ceiling System
U-Baffle Ceiling System
Size: 30*70*0.8mm
Color Code: ME-S030