loading

PRANCE metalwork is a leading manufacturer of metal ceiling and facade systems.

China Guangzhou Baidu Apollo Park Facade Project

A typical project that showcases PRANCE's capabilities involves the renovation of an old building, encompassing the design, production, and installation of a new facade with 4000m2 within 45 month.

China Guangzhou Baidu Apollo Park Facade Project 1
China Guangzhou Baidu Apollo Park Facade Project 2
China Guangzhou Baidu Apollo Park Facade Project 3
China Guangzhou Baidu Apollo Park Facade Project 4

 

 

Project Introduction And Architectural Overview

Located on Hulin Road in Wenchong Street, Huangpu District, Guangzhou, the property initially had low efficiency. However, after the construction, it has been transformed into Baidu Apollo Park, which is now recognized as China's most comprehensive and visually appealing intelligent connected vehicle application park. Notably, the park features the establishment of Baidu's national next-generation AI open innovation platform for autonomous driving.

Baidu is a prominent Chinese technology company that provides a diverse range of Internet-based services and products. It is widely recognized as the leading search engine in China, akin to Google's prominence worldwide. Baidu offers an extensive array of services encompassing search engines, online advertising, maps, cloud storage, artificial intelligence, autonomous driving, and more.

This project involves the renovation of an existing building by refurbishing it on the foundation of its original architectural structure and installing beautiful exterior wall cladding.

 

Following video shows the whole process from old building to completely renovation building with beautiful facade.

 

China Guangzhou Baidu Apollo Park Facade Project 5
China Guangzhou Baidu Apollo Park Facade Project 6
China Guangzhou Baidu Apollo Park Facade Project 7
China Guangzhou Baidu Apollo Park Facade Project 8
China Guangzhou Baidu Apollo Park Facade Project 9
China Guangzhou Baidu Apollo Park Facade Project 10
China Guangzhou Baidu Apollo Park Facade Project 11

Project Duration: November 4th, 2020 to January 28th, 2021

Project Area: 4000 square meters

Total Aluminum Panel Usage: 4000 square meters

Total Steel Usage: 100 tons

Number Of Construction Personnel: 60 people

Construction Equipment: 40 welding machines, 10 aerial work platforms, 2 cranes, 4 cutting machines, and N units of other auxiliary tools.

 

Challenge

First Difficulty: Given short completion time: Complete 4000m2 metal facade cladding project within 45 month.

Our work included:

China Guangzhou Baidu Apollo Park Facade Project 12
Detailed Engineering Design
Sending our technician to the jobsite to do the on-site measurement, recording the data with the 3D scanner and creating the 3D model so we have construction drawings, aluminum plate layout drawings, and fabrication drawings based on the model.
China Guangzhou Baidu Apollo Park Facade Project 13
Production
Manufacture the 3.0mm thick perforated aluminum cladding panels with PVDF surface finish.
China Guangzhou Baidu Apollo Park Facade Project 14
Installation
Welding the steel frame, Assembling the steel frame components on the ground, Lifting and stabling partial and overall steel frame on wall, Aluminum cladding installation + Application of sealant + Aluminum cladding Surface cleaning.
China Guangzhou Baidu Apollo Park Facade Project 15
Second Difficulty

Due to the short time frame, simultaneous operations across multiple processes are required.

Each material needs to have its dimensions and quantities extracted from the model separately, and production and welding should be arranged directly.

A seamless flow from the framework to the aluminum panels is essential, and any errors should be avoided to ensure completion within the given timeframe.

There are high demands for on-site personnel coordination, precision in framework fabrication, and speed in factory processing.

China Guangzhou Baidu Apollo Park Facade Project 16
Third Difficulty

Cross-Operations with Multiple Teams on Site: Due to this project being a renovation of an existing building rather than a completely new construction, combined with the short time frame, all teams are required to work at the same time.

These teams include landscaping, aluminum cladding installation, demolition, transportation, piping, and other teams beside us. There is a high demand for site and time allocation, as we are working around the entire exterior facade of the building. Every corner of the site needs to be utilized efficiently.

 

Technical Solution

Due to the tight timeline and the fact that the client has awarded us the project for both material supply and installation, our technical team and project management team have decided to adopt a modified construction sequence.

Typically, the standard procedure involves constructing the framework first, followed by on-site measurements, ordering and manufacturing the aluminum panels, and finally installing the panels. However, in order to expedite the project, we have made the decision to simultaneously proceed with framework welding, wall installation, and the parallel process of ordering and fabricating aluminum panels based on the model dimensions. Subsequently, the aluminum panels will be installed synchronously, prioritizing progress while ensuring that the steel framework is in place.

China Guangzhou Baidu Apollo Park Facade Project 17
China Guangzhou Baidu Apollo Park Facade Project 18
China Guangzhou Baidu Apollo Park Facade Project 19
China Guangzhou Baidu Apollo Park Facade Project 20
China Guangzhou Baidu Apollo Park Facade Project 21
China Guangzhou Baidu Apollo Park Facade Project 22

 

Product On-Site Pictures

Base on the requirement, PRANCE offer the Product Feature shown below:

  •  Aluminum Panels: Utilizing 3.0mm thick 3003 series alloy aluminum panels with 60mm perforations and integrated corner processing, the surface is coated with a three-layer fluorocarbon spray coating. The design lifespan is 25 years.
  •  Structural Steel Support: Made of Q235B steel, the surface undergoes a 250g galvanized treatment. Welded joints require two coats of anti-rust paint, and the entire structure needs to be coated with two layers of fluorocarbon paint. The design lifespan for the structure and materials is 50 years, while the lifespan for the rear-embedded plates is 30 years.
  •  Fasteners: All fasteners are made of SUS304A2-70 stainless steel, including tapered chemical bolts.
  •  Structural Adhesive And Sealant: Both are weather-resistant silicone sealants.
China Guangzhou Baidu Apollo Park Facade Project 23
China Guangzhou Baidu Apollo Park Facade Project 24
China Guangzhou Baidu Apollo Park Facade Project 25
China Guangzhou Baidu Apollo Park Facade Project 26

 

Production Process And Technical Services

Production is a crucial aspect where we have always excelled, as we align with and meet the schedule set by the on-site project team. Ensuring the accuracy of the framework dimensions, on-site measurements, and aluminum panel dimensions, all intricately interconnected, requires meticulous coordination. Effective division of labor is not a simple task to accomplish.

China Guangzhou Baidu Apollo Park Facade Project 27
China Guangzhou Baidu Apollo Park Facade Project 28
China Guangzhou Baidu Apollo Park Facade Project 29
China Guangzhou Baidu Apollo Park Facade Project 30

 

Installation procedure

This project has been contracted to the PRANCE team as a complete package, including the supply of materials and installation. This includes the provision of embedded components and iron square passageways. Due to the tight timeline, we need to deliver the project to the client within two months. Therefore, we are combining several processes together for this project. We will weld and assemble the iron square passageways and simultaneously arrange workers to install the embedded components on the upper floors. Next, we will lift the fully formed iron framework onto the building and securely fix it in place. Once the framework is in position, we will take on-site measurements to ensure consistency with our existing model dimensions before ordering and installing the facade wall cladding.

China Guangzhou Baidu Apollo Park Facade Project 31
China Guangzhou Baidu Apollo Park Facade Project 32
China Guangzhou Baidu Apollo Park Facade Project 33
China Guangzhou Baidu Apollo Park Facade Project 34

 

Installing the steel frame onto the building

China Guangzhou Baidu Apollo Park Facade Project 35
China Guangzhou Baidu Apollo Park Facade Project 36
China Guangzhou Baidu Apollo Park Facade Project 37
China Guangzhou Baidu Apollo Park Facade Project 38
China Guangzhou Baidu Apollo Park Facade Project 39
China Guangzhou Baidu Apollo Park Facade Project 40

 

Installing the facade wall cladding onto the steel frame

China Guangzhou Baidu Apollo Park Facade Project 41
China Guangzhou Baidu Apollo Park Facade Project 42
China Guangzhou Baidu Apollo Park Facade Project 43
China Guangzhou Baidu Apollo Park Facade Project 44
China Guangzhou Baidu Apollo Park Facade Project 45
China Guangzhou Baidu Apollo Park Facade Project 46

 

Preliminary Solution Content
China Guangzhou Baidu Apollo Park Facade Project 47
China Guangzhou Baidu Apollo Park Facade Project 48
China Guangzhou Baidu Apollo Park Facade Project 49
China Guangzhou Baidu Apollo Park Facade Project 50
China Guangzhou Baidu Apollo Park Facade Project 51
China Guangzhou Baidu Apollo Park Facade Project 52
China Guangzhou Baidu Apollo Park Facade Project 53
China Guangzhou Baidu Apollo Park Facade Project 54
China Guangzhou Baidu Apollo Park Facade Project 55

 

Project Completed
China Guangzhou Baidu Apollo Park Facade Project 56
China Guangzhou Baidu Apollo Park Facade Project 57
China Guangzhou Baidu Apollo Park Facade Project 58
China Guangzhou Baidu Apollo Park Facade Project 59

prev
China Haikou Sun&Moon Global Duty Free Plaza Metal Ceiling Project
recommended for you
no data
Interested?
Request a call from a specialist
Tailor-make profect solutions for your metal ceiling & wall projects. Get a complete solution for customized metal ceiling & wall projects. Receive technical support for metal ceiling & wall design,installation & correction.
Contact Info
Tel: +86-757-83138155
Tel/Whatapps: +86-13809708787
Fax: +86-757-83139722
Office: 3F.1st Building,No.11 Gangkou Rd, Chancheng, Foshan, Guangdong.

Factory: 169, South Area, Base of Electrical and Electronic lndustry, Baini, Sanshui, Foshan, Guangdong.
Are you interested in Our Products?
We can customize installation drawings specifically for this product for you. Please contact us.
弹窗效果
Customer service
detect