loading

PRANCE metalwork is a leading manufacturer of metal ceiling and facade systems.

Products
Products

What project management challenges should contractors anticipate when specifying glass exterior walls?

2025-12-18
Contractors should anticipate coordination complexity, long lead times, tight tolerances, logistics, and warranty/clause management. Early integration of façade specialists in design reduces design-for-manufacture issues. Lead time for custom glass, coatings, and unitized modules can be many months—impacting procurement and schedule; contingency planning for fabrication delays is necessary. Tolerances at the building interface require precise structural surveying and as-built verification to avoid rework. On-site logistics for storage, handling, crane lifts, and sequencing with other trades (MEP, roofing, slab edge work) present staging challenges. Safety and access planning for installation and future maintenance (crane, BMU systems) must be resolved early. Quality assurance responsibility often spans multiple parties—designers, manufacturers, installers—so clear contractual responsibility and testing deliverables are essential. Risk management includes insurance for glass breakage, detailed mockups for signoff, and cashflow planning due to high upfront fabrication costs. Finally, regulatory approvals and third-party testing may add time; proactive engagement with AHJs and façade engineers mitigates surprises.
prev
How do glass exterior walls integrate with curtain wall systems and aluminum framing solutions?
Related questions
no data
GET IN TOUCH WITH Us
Contact Info
Tel: +86-757-83138155
Tel/Whatapps: +86-13809708787
Fax: +86-757-83139722
Office: 3F.1st Building,No.11 Gangkou Rd, Chancheng, Foshan, Guangdong.

Factory: 169, South Area, Base of Electrical and Electronic lndustry, Baini, Sanshui, Foshan, Guangdong.
Are you interested in Our Products?
We can customize installation drawings specifically for this product for you. Please contact us.
弹窗效果
Customer service
detect