Project Name: NH Hotel Project
Time: 2014
Area: 2000 sqm
Location: Saudi Arabia
Solution: Curtain wall / High partition / Metal Ceiling
1. According to the drawing and BOQ from customer, and the communication between PRANCE’s representatives and clients.We will know the project basic information and the products requests.
2. After PRANCE’s technical team study & analyze the plan drawings and BOQ from customer,we list out to our clients what we can supply, show initial design and offer production quotation.
3. We will make adjustment with our clients suggestions after he/she checked our design plan.
Then we will offer a final design and products application sketches. With the customer’s approval of thisorder we start the production.
• 1st Floor ceiling design
Product :
• Gym room ceiling design
Product : 1. Aluminum square tube ceiling 2. Accessories
• Wash room ceiling design
Product : 1. Aluminum square tube ceiling 2. Accessories
• Office ceiling design
Product : 1. Aluminum Carved Board (Diamond shape) 2. Accessories
• Installation method
Clip in Ceiling Installation:
1. Ceiling tile 2. Spring tee 3. Hanger for spring tee 4. Thread rod 5. Expansion screw 6. Angle |
Deep combined ceiling installation:
1. Expansion screw 2. Thread sod 3. Hanger for main channel 4. Main channel 5. Hanger for spring tee 6. Spring tee 7. Cover 300 x 300 mm 8. Frame 600 x 600 mm 9. Strip box 10. Square box |
The curtain wall part of this project is using PRANCE high quality unit curtain wall system.
• Installation of curtain wall
1.Embedded parts | 2.Fixing the supporting part on the Embedded parts. | 3.Fixing the Unit curtain wall on the supporting part with assemble screw. |
4.Fixing the Unit curtain wall on the supporting part with assemble screw accessories |
5.Final connector Lock with the screw | 6.Final effect |
The partition of this project is using PRANCE Aluminum-alloy & glass high partition and Gypsum board partition.